<kbd id="tpzj2byj"></kbd><address id="ntq5rz1j"><style id="uc0w61s1"></style></address><button id="epzeqqn0"></button>

          Capital Giving

          Center for Worship and Performing Arts
          Charlotte Christian completed phase 1 of the master campus plan during the Fall of 2017 with the Center for Worship and Performing Arts campaign. The two-story, 20,515 square-foot building is centrally located on campus behind the Hendrick Center for Arts and Science.

          The Center for Worship and Performing Arts houses an auditorium capable of hosting full-scale theatrical productions and weekly chapels as well as various assemblies and annual school events, including band, choir, and orchestra concerts. The state-of-the-art facility includes a scene shop specially designed for set construction; a black box theater for smaller productions; and dressing rooms. A window-lined art gallery will be the edge of one side of the building and will feature original work from our JK-grade 12 artists.

          Bryte Little Efird Media Center
          Charlotte Christian is kicking off the 2015-16 school year with the newly renovated Bryte Little Efird Media Center which features extensive technology and collaboration zones designed specifically for middle and upper school students. The new media center includes a touch screen interactive TV featuring school events; a digital hearth TV; collaborative booth TVs; a SMART technology interactive projector; private meeting space for faculty professional development; and numerous charging stations and work spaces for students to use their MacBooks or work collaboratively on group projects.

           

          Renovated Athletic Stadium & Track
          In the summer of 2015, the school renovated and replaced the synthetic turf on the athletic field and installed a new track. 

           

          Hendrick Center for Arts and Science
          The new facility was completed in July 2014 to open for the 2014-15 school year. It is the first building on campus to offer instructional space for students in all grade levels. It includes more than 20,000 square feet and houses the lower school STEM lab, media center, technology lab, and music classroom; middle school Latin classroom; orchestra studio; three visual arts studios; an upper school math and science classroom; and an Academic Services Center which includes offices for the school’s director of academics, academic services coordinator, lower school principal, tutoring offices, and the school’s receptionist. 

           

          Main Parking Lot
          The complete renovation of the parking lot took place in the summer of 2013. The new parking areas were completed just in time for the first day of school for the 2013-14 year. At completion, 65 new and wider spaces had been added to campus, and the traffic lanes had been improved to provide more efficient flow of traffic.

          Warner Field House & Guy Gymnasium Expansion 
          500 Internal Server Error

          Internal Server Error

          The server encountered an internal error and was unable to complete your request. Either the server is overloaded or there is an error in the application.

              <kbd id="yz0tb1ig"></kbd><address id="lokk70qq"><style id="8kt833vj"></style></address><button id="yay7wvkx"></button>